Estimation of Power Production Potential from Natural Gas
Pressure Reduction Stations in Pakistan Using ASPEN HYSYS
Keywords: Pressure into Power, Sales Metering Station, Turbo Expanders, Natural Gas.
Mehran University Research Journal of Engineering & Technology
Volume 34 , Issue 3
Imran Nazir Unar , Aziza Aftab , Masroor Abro ,
References
1. |
GOP, “Economic Survey of Pakistan 2012-2013â€, pp.
189-191, Ministry of Finance, Government of Pakistan,
Islamabad |
2. |
MPNR., “Year Book 2010-2011â€, Ministry of Petroleum
and Natural Resources (MNPR), Pakistan, 2011 |
3. |
OGRA., “Oil and Gas Regulatory Authority Ordinance-
2002â€, Statutory Notification-SRO No. 675(I)/2004.
The Gazette Of Pakistan (Extra), pp. 2345-2687, August
9, 2009 |
4. |
Po•ivil, J., “Use of Expansion Turbines in Natural Gas
Pressure Reduction Stationsâ€, Acta Montanistica
Slovaca,, Volume 9, No. 3, pp. 258-260. 2004 |
5. |
Ardali, E.K., and Hybatian, E., “Energy Regeneration in
Natural Gas Pressure Reduction Stations by Use of Gas
Turbo-Expander; Evaluation of Available Potential in
Iranâ€, Proceedings of 24th World Gas Conference,
Buenos Aires, Argentina. 2009 |
|
|
|