Comparison of Genetic Algorithm and Harmony Search for
Generator Maintenance Scheduling
Keywords: GMS, Power System, Optimization, GA, HS Algorithm
Mehran University Research Journal of Engineering & Technology
Volume 31 , Issue 4
Laiq Khan , Sidar Mumtaz , Amjadullah Khattak ,
References
1. |
Ben-Daya, M., Duffuaa, O.S., and Raouf, A.,
"Maintenance Modeling and Optimization", Kluwer
Academic Publishers, pp. 55, London, 2000. |
2. |
Yamayee, Z.A., and Sidenblad, K., "A Computationally
Efficient Optimal Maintenance Scheduling Method",
IEEE Transactions on Power Apparatus and Systems,
Volume PAS-102, pp. 330-338, 1983. |
3. |
Kothari, D.P., "Fuzzy Dynamic Programming Based
Optimal Generator Maintenance Scheduling
Incorporating Load Forecasting", IOS Press Amsterdam,
pp. 233-249, 1997. |
4. |
Escudero, L.F., Horton, J.M., and Scheiderich, J.E.,
"Maintenance Scheduling of Production Unit", European
Journal of Operational Research, Volume 9,
pp. 264-274, March, 1982. |
5. |
Mukerjee, R., Merrill, H.M., Erickson, B.W., Parker,
J.H., and Friedman, R.E., "Power Plant Maintenance
Scheduling Optimizing Economics and Reliability", IEEE
Transactions on Power Systems, Volume 6,
pp. 476-483, 1991. |
6. |
Edwin, K.W., and Curtius, F., "New Maintenance
Scheduling Method with Production Cost Minimization
via Integer Linear Programming", International Journal
of Electrical Power and Energy Systems, Volume 12,
pp. 165-170, 1990. |
7. |
Chen, L.N., and Toyoda, J., "Optimal Generating Unit
Maintenance Scheduling for Multi Area System with
Network Constraints", IEEE Transactions on Power
Systems Volume 6, pp. 1168-1174, 1991. |
8. |
Yellen, J., Al-Khamis, T.M., Vemuri, S., and Lemonidis,
L., "Decomposition Approach to Unit Maintenance
Scheduling", IEEE Transactions on Power Systems,
Volume 7, pp. 726-733, 1992. |
9. |
Stremel, J.P., "Maintenance Scheduling for Generating
System Planning", IEEE Transactions on Power
Apparatus and Systems, Volume 100, pp. 1410-1419,
1981. |
10. |
Duval, P.E., and Poilpot, R., "Determining Maintenance
Schedule for Thermal Production Units: The KAPILA
Model", IEEE Transactions on Power Apparatus and
Systems, Volume 102, pp. 2509-2525, 1983. |
11. |
Kralj, B.L., and Petrovic, R., "Optimal Preventive
Maintenance Scheduling of Thermal Generating Units
in Power Systems: A Survey of Problem Formulation
and Solution Methods", European Journal of Operation
Research, Volume 35, pp. 1-15, 1988. |
12. |
Contaxis, G.C., Kavatza, S.D., and Vournas, C.D., "An
Interactive Package for Risk Evaluation and
Maintenance Scheduling", IEEE Transactions on Power
Systems, Volume 4, pp. 389-395, 1989. |
13. |
Lin, C.E., Huang, C.J., Huang, C.L., and Liang, C.C.,
"An Expert System for Generator Maintenance
Scheduling Using Operation Index", IEEE Transactions
in Power Systems, Volume 7, pp. 1141-1148, 1992. |
14. |
Momoh, J.A., and Tomsovic, K., "Overview and
Literature Survey of Fuzzy Set Theory in Power Systems",
IEEE Transactions on Power Systems, Volume 10,
pp. 1676-1690, 1995. |
15. |
Huang, C.J., Lin, C.E., and Huang, C.L., "Fuzzy Approach
for Generator Maintenance Scheduling", Electric Power
Systems Research, Volume 24, pp. 31-38, 1992. |
16. |
Baskar, S., Subbaraj, P., Rao, M.V.C., and Tamilselvi, S.,
"Genetic Algorithms Solution to Generator Maintenance
Scheduling with Modified Genetic Operators", IEEE
Proceedings: Generation, Transmission and Distribution,
pp. 56-66, 2003. |
17. |
Wang, Y., and Handschin, E., "A New Genetic Algorithm
for Preventive Unit Maintenance Scheduling of Power
Systems", International Journal of Electrical Power
Energy System, pp. 343-348, 2000. |
18. |
Satoh, T., and Nara, K., "Maintenance Scheduling by
Using Simulated Annealing Method", IEEE Transaction
on Power System, pp. 850-857, 1991. |
19. |
El-Sharkh, M.Y., and El-Keib, A.A., "An Evolutionary
Programming-Based Solution Methodology for Power
System Generation and Transmission Maintenance
Scheduling", Electric Power Systems, pp. 35-40, 2003. |
20. |
Park, J., Choi, J., Baek, U., Cha, J., and Lee, K.Y.,
"Flexible Maintenance Scheduling of Generation System
by Multi Probabilistic Reliability Criterion in Korean
Power System", Journal of Electrical Engineering &
Technology, Volume 5, pp. 1-178, 2010 |
21. |
Changyou, F., Xifan, W., and Wenbo, W., "Power Plant
Maintenance Scheduling Considering Unit Failure",
Electric Power Automation Equipment, 2009. |
|
|
|