Captive Power Plant Selection for Pakistan Cement Industry in Perspective of Current Energy Crises: A Fuzzy-AHP Approach

Keywords: Fuzzy Analytical Hierarchy Process, Multi-Criteria Decision Making, Captive Power Plants, Cement Industry.

Mehran University Research Journal of Engineering & Technology

Volume 36 ,  Issue 4

HAFIZ MUHAMMAD  KHURRAM  ALI , AMIR SULTAN   , BAKHT BAHADUR RANA   ,

References
1. Government of Pakistan, "State of Industry Report",National Electric Power Regulatory Authority, Islamabad, Pakistan, 2014.
2. Government of Pakistan, "Power System Statistics 2013- 2014", National Transmission and Dispatch Company, Islamabad, Pakistan, 2014.
3. Aliani, F., "Pakistan Cements", BMA Capital Management Ltd, Karachi, Pakistan, 2013.
4. Raza, A., "Cement Industry: Concrete Base Appears Despite Cost Increase", Pearl Securities Ltd, Karachi, Pakistan, 2015.
5. Subohi, A., "Plans for Captive Power Plants in Cement Sector", Daily Dawn,Pakistan, Herald Publications, Karachi, Pakistan, May, 2013.
6. Mahmood, A., Javaid, N., Zafar, A., Ali, R., Ahmed, S., and Razzaq, S., "Pakistan’s Overall Energy Potential Assessment, Comparison of LNG, TAPI and IPI Gas Projects", Renewable and Sustainable Energy Reviews, Volume 31, pp. 182-193, 2014.
7. Shahid, F.,"Cement Industry", Research Report by MM Securities Pvt. Ltd., Karachi, Pakistan, 2014.
8. Subohi, A., "Producing Power from Waste", Report Published by Dawn,Pakistan, Herald Publications, Karachi, Pakistan, August, 2012.
9. Gohar, K., Jahanzaib, M., and Ali, M.K., "Consumer Preferences for Selection of Solar Home Systems in Urban Areas of Pakistan", Meharan University Research Journal of Engineering and Technology, Volume 33, No. 4, pp. 441-448, Jamshoro, Pakistan, October, 2014.
10. Kahraman, C., Çevik, S., Ates, N.Y., and Gülbay, M., "Fuzzy Multi-Criteria Evaluation of Industrial Robotic Systems", Computers & Industrial Engineering, Volume 52, No. 4, pp. 414-433, 2007.
11. Zheng, G., Zhu, N., Tian, Z., Chen, Y., and Sun, B., "Application of a Trapezoidal Fuzzy AHP Method for Work Safety Evaluation and Early Warning Rating of Hot and Humid Environments", Safety Science, Volume 50, No. 2, pp. 228-239, 2012.
12. Laarhoven, P.J.M., and Pedrycz, W., "A Fuzzy Extension of Saaty's Priority Theory", Fuzzy Sets and System, Volume 11, pp. 229-241, 1983.
13. Buckley, J.J., "Fuzzy Hierarchical Analysis", Fuzzy Sets and Systems, Volume 17, No. 3, pp. 233-247, 1985.
14. Jafarian, M.,and Vahdat, S.E., "A Fuzzy Multi-Attribute Approach to Select the Welding Process at High Pressure Vessel Manufacturing", Journal of Manufacturing Processes, Volume 14, No. 3, pp. 250-256, 2012.
15. Isaai, M.T., Kanani, A., Tootoonchi, M., and Afzali, H.R., "Intelligent Timetable Evaluation Using Fuzzy AHP", Expert Systems with Applications, Volume 38, No. 4, pp. 3718-3723, 2011.
16. Gao, L., and Hailu, A., "Evaluating the Effects of Area Closure for Recreational Fishing in a Coral Reef Ecosystem: The Benefits of an Integrated Economic and Biophysical Modeling", Ecological Economics, Volume 70, No. 10, pp. 1735-1745, 2011.
17. Hsu, Y.G., Tzeng, G.H., and Shyu, J.Z., "Fuzzy Multiple Criteria Selection of Government Sponsored Frontier Technology R&D Projects", R&D Management, Volume 33, No. 5, pp. 539-551, 2003.
18. Wang, Y.M., Luo, Y., and Hua, Z., "On the Extent Analysis Method for Fuzzy AHP and its Applications", European Journal of Operational Research, Volume 186, No. 2, pp. 735-747, 2008.
19. Calabrese, A., Costa, R., and Menichini, T., "Using Fuzzy AHP to Manage Intellectual Capital Assets: An Application to the ICT Service Industry", Expert Systems with Applications, Volume 40, No. 9, pp. 3747-3755, 2013.
20. Lee, S.K., Mogi, G., and Kim, J.W., "Decision Support for Prioritizing Energy Technologies Against High Oil Prices: AFuzzy Analytic Hierarchy Process Approach", Journal of Loss Prevention in the Process Industries, Volume 22, No. 6, pp. 915-920, 2009.
21. Choudhary, D., and Shankar, R., "An STEEP-Fuzzy AHPTOPSIS Framework for Evaluation and Selection of Thermal Power Plant Location: A Case Study from India", Energy, Volume 42, No. 1, pp. 510-521, 2012.
22. Kahraman, C., and Kaya, Ý., "A Fuzzy Multicriteria Methodology for Selection Among Energy Alternatives", Expert Systems with Applications, Volume 37, No. 9, pp. 6270-6281, 2010.
23. Tasri, A., and Susilawati, A., "Selection Among Renewable Energy Alternatives Based on a Fuzzy Analytic Hierarchy Process in Indonesia", Sustainable Energy Technologies and Assessments, Volume 7, pp. 34-44, 2014.
24. Heo, E., Kim, J., and Boo, K.J., "Analysis of the Assessment Factors for Renewable Energy Dissemination Program Evaluation using Fuzzy AHP", Renewable and Sustainable Energy Reviews, Volume 14, No. 8, pp. 2214-2220, 2010.
25. Ali, M.K., Akhtar, K., and Jahanzaib, M., "A Hybrid Multidimensional Approach to Select a Country for Global Cement Plant Location", Meharan University Research Journal of Engineering & Technology, Volume 34, No. 2, pp. 155-168, Jamshoro, Pakistan, April, 2015.
26. Ali, H.M.K., "Global Facility Location; A Hybrid Modeling Approach", DoctoralThesis, Department of Idustrial Engineering, University of Engineering & Technology, Taxila, Pakistan, 2015.
27. Chou, C., "The Canonical Representation of Multiplication Operation on Triangular Fuzzy Numbers", Computers & Mathematics with Applications, Volume 45, No. 10, pp. 1601-1610, 2003.
28. Chang, D.Y., "Applications of the Extent Analysis Method on Fuzzy AHP", European Journal of Operational Research, Volume 95, No. 3, pp. 649-655, 1996.
29. Wang, Y.M., and Elhag T.M.S., "On the Normalization of Intervals and Fuzzy Weights", Fuzzy Sets and Systems, Volume 157, pp. 2456-2471, 2006.
30. Chou, C.C. and Yu, K.W., "Application of a New Hybrid Fuzzy AHP Model to the Location Choice", Mathematical Problems in Engineering, 2013.